EdgeBox 30

OTTO

The OTTO EDGE 120 M enables the deployment of high-density to compute systems in locations where traditional and “next-generation” cooling and infrastructure technologies are ineffective. In a completely autonomous system, the OTTO EDGE 120 M delivers up to 120kW (120,000 watts) of cooling capacity. Densities of up to 2kW (2,000 watts) per square foot are attainable with a footprint of only 60 SqFt, significantly decreasing physical footprint and site infrastructure needs. Because of the modular architecture of this OTTO platform and the minimal site requirements, systems using the OTTO EDGE 120 M may be implemented in one-third the time of standard data center deployments

Highlights

Interdum et malesuada fames ac ante ipsum primis in faucibus. Sed non neque diam.
Nullam imperdiet justo sapien. Sed in sem non enim rutrum.

120kw - 2PLIC HPC Datacenter Platform • Fully Robotic Hot Swapping (Lights Out) •N+3

480v or 415v Power Feed

Fiber Link

Racks/PSUs/Fiber included

Local and Remote Operation (HMI/API)

Environment Neutral (Ties directly into new or Existing facility systems.) • P.U.E. 1.028 (Full System PUE)

L: 12FT W: 5FT H: 9FT

Total Square Footage: 60

Dimensions

Interdum et malesuada fames ac ante ipsum primis in faucibus. Sed non neque diam.

L

5'-8"

W

2'-10"

H

7'-3"

Play Video

Highlights of Making Servers Immersion Ready

TMGcore headquarters in Plano, Texas houses the World’s most advanced 2- Phase Immersion Lab.

With immersion, single or 2-Phase, all of the moving parts, heat syncs and fans must be removed. TMGcore calls this process making servers Immersion Ready.

OPTION

01

TMGcore purchases desired servers for End-User.

OPTION

02

If End-User has already purchased the servers, the End-User will send them to TMGcore in Plano, Texas

TMGcore will be glad to assist End-Users with making the server of their choice immersion ready.

Immersion Ready Process

To make servers immersion ready, TMGcore will:

Remove the heat syncs

Remove the
fans

Add boiler enhancements as needed

Any bios modifications that are necessary

Dry Rack

Within each EdgeBox there is a dry rack to house storage servers as well as network switches.

Get in touch with us!

    EdgeBox 4.5

    OTTO

    The OTTO EDGE 120 M enables the deployment of high-density to compute systems in locations where traditional and “next-generation” cooling and infrastructure technologies are ineffective. In a completely autonomous system, the OTTO EDGE 120 M delivers up to 120kW (120,000 watts) of cooling capacity. Densities of up to 2kW (2,000 watts) per square foot are attainable with a footprint of only 60 SqFt, significantly decreasing physical footprint and site infrastructure needs. Because of the modular architecture of this OTTO platform and the minimal site requirements, systems using the OTTO EDGE 120 M may be implemented in one-third the time of standard data center deployments

    Highlights

    Interdum et malesuada fames ac ante ipsum primis in faucibus. Sed non neque diam.
    Nullam imperdiet justo sapien. Sed in sem non enim rutrum.

    120kw - 2PLIC HPC Datacenter Platform • Fully Robotic Hot Swapping (Lights Out) •N+3

    480v or 415v Power Feed

    Fiber Link

    Racks/PSUs/Fiber included

    Local and Remote Operation (HMI/API)

    Environment Neutral (Ties directly into new or Existing facility systems.) • P.U.E. 1.028 (Full System PUE)

    L: 12FT W: 5FT H: 9FT

    Total Square Footage: 60

    Dimensions

    Interdum et malesuada fames ac ante ipsum primis in faucibus. Sed non neque diam.

    L

    5'-8"

    W

    2'-10"

    H

    7'-3"

    Play Video

    Highlights of Making Servers Immersion Ready

    TMGcore headquarters in Plano, Texas houses the World’s most advanced 2- Phase Immersion Lab.

    With immersion, single or 2-Phase, all of the moving parts, heat syncs and fans must be removed. TMGcore calls this process making servers Immersion Ready.

    OPTION

    01

    TMGcore purchases desired servers for End-User.

    OPTION

    02

    If End-User has already purchased the servers, the End-User will send them to TMGcore in Plano, Texas

    TMGcore will be glad to assist End-Users with making the server of their choice immersion ready.

    Immersion Ready Process

    To make servers immersion ready, TMGcore will:

    Remove the heat syncs

    Remove the
    fans

    Add boiler enhancements as needed

    Any bios modifications that are necessary

    Dry Rack

    Within each EdgeBox there is a dry rack to house storage servers as well as network switches.

    Get in touch with us!

      OTTO EDGE 120 M

      OTTO

      The OTTO EDGE 120 M enables the deployment of High-Density Compute (HDC) systems in locations were traditional and “next-generation” cooling and infrastructure technologies are ineffective. In a completely autonomous system using Two-Phase Liquid Immersion Cooling (2PLIC), the OTTO EDGE 120 M delivers up to 120 kW (120,000 watts) of cooling capacity. Densities of up to 2 kW (2,000 watts) per square foot are attainable with a footprint of only 60 sq. ft., significantly decreasing physical footprint and site infrastructure needs. Because of the modular architecture of this OTTO platform and the minimal site requirements, systems using the OTTO EDGE 120 M may be implemented one third the time of standard deployments.

      Highlights

      120KW of compute power that can be deployed right at the Edge. Automated systems to ensure uptime. Liquid cooling so those servers are always running at peak performance.

      120 kW – 2PLIC HPC Datacenter Platform * Fully Robotic Hot Swapping (Lights Out) * N+3

      480 V or 415 V Power Feed

      Fiber Link

      Racks/PSUs/Fiber included

      Local and Remote Operation (HMI/API)

      Environment Neutral (Ties directly into new or Existing facility systems.) • P.U.E. 1.028 (Full System PUE)

      Length: 12 ft. * Width: 5 ft. * Height 9 ft.

      Total Square Footage: 60

      Dimensions

      Interdum et malesuada fames ac ante ipsum primis in faucibus. Sed non neque diam.

      L

      5'-8"

      W

      2'-10"

      H

      7'-3"

      Play Video

      Highlights of Making Servers Immersion Ready

      TMGcore headquarters in Plano, Texas houses the world’s most advanced 2-Phase Immersion Lab.

      With immersion, single or 2-Phase, all of the moving parts, heat syncs and fans must be removed. TMGcore calls this process making servers Immersion Ready.

      OPTION

      01

      TMGcore purchases desired servers for End-User.

      OPTION

      02

      If End-User has already purchased the servers, the End-User will send them to TMGcore in Plano, Texas

      TMGcore will be glad to assist End-Users with making the server of their choice immersion ready.

      Immersion Ready Process

      To make servers immersion ready, TMGcore will:

      Remove the heat syncs

      Remove the
      fans

      Add boiler enhancements as needed

      Any bios modifications that are necessary

      Dry Rack

      Within each EdgeBox there is a dry rack to house storage servers as well as network switches.